Skip Navigation

Compressor Air End Rebuild Service

Turnaround time in as little as 5 to 7 days.

Air ends of screw compressors in industrial applications are exposed to heavy operation and thus underlie permanent wear. eCompressedair.com specializes in compressor airend rebuild service to make your compressor run reliable again, with a 2 year warranty.

To get started, send us an RFQ today or call Toll Free: 866-650-1937.

Read Follow Our Blog Why replace when you can rebuild? to read more in detail about the common causes of air end failures.

  1. After you place your order, you'll skid your airend and ship it per our instructions
  2. Airend arrives at our repair center. The airend is inspected and enters our rebuild process
  3. Airend rebuild is completed in 3 to 5 business days
  4. Unit is skidded and packaged appropriately and shipped back to your location

 

Air End Repair Quote
Rotary_screw
Rebuilding Process

To get started, send us an RFQ today or call Toll Free: 866-650-1937.

What Happens to Your Airend?

  • Your airend is loaded off and taken immediately to the disassembly area which contains mounting stand, overhead crane and oil pit for collecting waste oil. All shipping documents are then forward to the office to be assigned a work order number, and a folder is generated for disassembly, teardown and spec sheets. This folder follows the airend through the entire rebuilding process to ensure accurate documentation.
  • Once the airend is disassembled, damage and measurements are recorded, and pictures are taken identifying the problem areas. A report is generated telling us the front and rear covers were damaged, the sealing strips are partially worn and the bearing journal on the rear is damaged. The seal area on the unit has groves and a small area of the male rotor bore is out of round.
  • At this point a quote is written for the rebuild and submitted to the customer for approval.
  • The disassembled airend is then placed in one of the self-contained cleaning systems.
  • Once we receive the OK and Purchase Order number from the customer, all parts that require work are brought to different areas of the shop and the repairs begin. The front and rear covers will be metalized using the thermal ARC system, when finished depending on the size of the cover, its moved to either the 20" or 36" Blanchard grinder for finishing.
  • The front male rotor bearing journal is mounted and turned on a lathe and will also be metalized and ground according to specs.
  • The main bore area if damaged will be plated and bored on a vertical boring mill.
  • Seal strips are built up and re-cut on a custom jig.
  • Depending on the extent of the damage, the above work normally takes one to two days to complete.
  • All components are then rewashed and taken to the assembly area, where all the bearings, seals, gaskets, and related materials needed to complete the assembly are pulled from inventory. Rebuild Process
  • Before assembly takes place all the bearing pockets, bores, and alignments are rechecked. The two rotors are then checked for proper balance and alignment.
  • The bearings are removed from the boxes and re-measured for proper fit before installing.
  • To insure that the manufacturer's specs are being met, the unit is continually measured and re-checked for accuracy
  • Upon completion all open ports are plugged with plastic caps and the inlet taped. The airend is now ready to be skid mounted and painted.
  • As units enter the shipping area all necessary shipping documents and start-up procedures are attached to the unit, and trucking details are arranged.
  • This whole process will normally take on the average 3 to 5 working days, depending on the MM size and degree of damage. We have setup our shop so the work flows through on a orderly path to insure that all our inspection steps and quality controls are adhered too.